Shatin to Central Link Tunnel Boring Machine

Shatin to Central Link Tunnel

Client: Samsung - Hsin Chong Joint Venture

77f695_5b84970a3acb43f1a2f5af51a88a7158.webp

Internal structure of the Shatin to Central Link Tunnel Boring Machine

High Pressure Jet cleaning in Shatin to Central Link 

Tunnel Boring Machine

77f695_fe357108b92a416493a167730868c786.webp
Details
  • Location: Entrance Gate 9 off Sung Wong Toi Road, Kowloon
 
  • Date: 9th August 2015 
 
  • High Pressure Jet cleaning for the pipelines within the tunnel boring machine 
 
  • Length: Approximately 4.5 m
Job description
  • Cleaning works for drainage system within the tunnel boring machine
 
  • Cleaning works for pipes with length approximately 4.5 m
 
  • 8 pieces of pipeline required to be cleaned
 
  • Carry out High Pressure Jet cleaning (up to 2000 bar jet to remove hard material within pipes)
 
  • Remove and dispose the hard material cleaned out after the completion of the High Pressure Jet cleaning
Achievements
  • Clean out the hard material which causing blockage of the pipelines 
 
  • Causing minimal disruption to the Shatin to Central Link Tunnel Boring Machine
 
  • The water flow could pass through freely within the pipelines
 
  • Ensure the normal functioning of the Shatin to Central Link Tunnel Boring Machine