Shatin to Central Link Tunnel Boring Machine
Shatin to Central Link Tunnel
Client: Samsung - Hsin Chong Joint Venture
Internal structure of the Shatin to Central Link Tunnel Boring Machine
High Pressure Jet cleaning in Shatin to Central Link
Tunnel Boring Machine
Details
-
Location: Entrance Gate 9 off Sung Wong Toi Road, Kowloon
-
Date: 9th August 2015
-
High Pressure Jet cleaning for the pipelines within the tunnel boring machine
-
Length: Approximately 4.5 m
Job description
-
Cleaning works for drainage system within the tunnel boring machine
-
Cleaning works for pipes with length approximately 4.5 m
-
8 pieces of pipeline required to be cleaned
-
Carry out High Pressure Jet cleaning (up to 2000 bar jet to remove hard material within pipes)
-
Remove and dispose the hard material cleaned out after the completion of the High Pressure Jet cleaning
Achievements
-
Clean out the hard material which causing blockage of the pipelines
-
Causing minimal disruption to the Shatin to Central Link Tunnel Boring Machine
-
The water flow could pass through freely within the pipelines
-
Ensure the normal functioning of the Shatin to Central Link Tunnel Boring Machine